Part number CK-104 LONG LEAD with NSN 5910001135499 is now available in our ready-to-ship inventory. This part number is a Capacitor Fixed Ceramic Dielectr manufactured by Crl Components Inc CAGE Code 71590 . Are you looking for a quick and competitive quote for this part number? Just fill out the Request for Quote (RFQ) form to get started. As you fill out the RFQ form, make sure that you answer all asterisk-marked (*) fields like Need Parts By and Quantity (ea) completely and carefully. Your response to these fields will be used to determine the bulk of your quote. Within 15 minutes of receiving your RFQ, one of our dedicated sales representatives will contact you with your quote.
They are assigned and regulated by the Defense Logistics Agency and used by all members of the North Atlantic Treaty Organization (NATO). Are you interested in learning more about NSN 5910001135499? If so, call us at our toll-free number, +1-714-705-4780, or email us at sales@asapaerospacehub.com. We’re available 24/7x365. Also if you looking to buy CK-104 LONG LEAD under CAGE Code 71590 for Crl Components Inc then request a instant quote from us today.
NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
---|---|---|---|---|---|---|
5910-00-113-5499 Item Description: Capacitor Fixed Ceramic Dielectr | 5910 | 001135499 | 0 | P | A | |
CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
U | A | A | 0 | |||
Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
Ck-104 Long Lead | B | 1 | C | A |
MRC | Criteria | Characteristic |
---|---|---|
AAQL | BODY STYLE | W/O MTG FACILITIES TERMINAL(S) ON ONE SURFACE |
AARG | RELIABILITY INDICATOR | ESTABLISHED |
AARH | RELIABILITY FAILURE RATE LEVEL IN PERCENT | 0.0010 |
ABJT | TERMINAL LENGTH | 1.250 INCHES MINIMUM |
ADAQ | BODY LENGTH | 0.290 INCHES NOMINAL |
ADAT | BODY WIDTH | 0.290 INCHES NOMINAL |
ADAU | BODY HEIGHT | 0.090 INCHES NOMINAL |
AEBP | CENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO LENGTH | 0.200 INCHES NOMINAL |
AEBT | TERMINAL DIAMETER | 0.025 INCHES NOMINAL |
AEBZ | SCHEMATIC DIAGRAM DESIGNATOR | NO COMMON OR GROUNDED ELECTRODE(S) |
CQBF | INSULATION RESISTANCE AT MAXIMUM OPERATING TEMP | 10000.0 MEGOHMS |
CQBQ | CAPACITANCE VALUE PER SECTION | 0.100 MICROFARADS SINGLE SECTION |
CQFB | VOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE | -25.0/+15.0 WITH RATED VOLTAGE APPLIED SINGLE SECTION |
CQJJ | NONDERATED OPERATING TEMP | -55.0 DEG CELSIUS MINIMUM AND 125.0 DEG CELSIUS MAXIMUM |
CQWM | NONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION | 100.0 DC SINGLE SECTION |
CRTP | TOLERANCE RANGE PER SECTION | -10.00/+10.00 PERCENT SINGLE SECTION |
CWJK | CASE MATERIAL | PLASTIC |
CWPK | INSULATION RESISTANCE AT REFERENCE TEMP | 100000.0 MEGOHMS |
CWPM | DISSIPATION FACTOR AT REFERENCE TEMP IN PERCENT | 2.5000 |
CWSG | TERMINAL SURFACE TREATMENT | SOLDER |
NHCF | NUCLEAR HARDNESS CRITICAL FEATURE | HARDENED |
TEST | TEST DATA DOCUMENT | 81349-MIL-C-39014 SPECIFICATION (INCLUDES ENGINEERING TYPE BULLETINS, BROCHURES,ETC., THAT REFLECT SPECIFICATION TYPE DATA IN SPECIFICATION FORMAT; EXCLUDES COMMERCIAL CATALOGS, INDUSTRY DIRECTORIES, AND SIMILAR TRADE PUBLICATIONS, REFLECTI |
TTQY | TERMINAL TYPE AND QUANTITY | 2 UNINSULATED WIRE LEAD |
ZZZK | SPECIFICATION/STANDARD DATA | 81349-MIL-C-39014/2 GOVERNMENT SPECIFICATION |
ASAP Aerospace Hub, owned and operated by ASAP Semiconductor, is an industry-leading supplier of CK-104 LONG LEAD part by Crl Components Inc of CAGE Code 71590 with a comprehensive inventory of more than 10 million aviation manufacturer parts and NSNs, including NSN 5910001135499. As an AS9120B, ISO 9001:2015 certified and FAA 0056B accredited member of the Aviation Suppliers Association (ASA), we’re dedicated to meeting all of our customers’ needs as quickly and efficiently as possible. Our advanced shipping facilities are in USA.
Remember Us When You’re Looking for Competitively Priced, High-Quality Aviation Parts.
Request for Quote